October 24, 2019

 On Thursday 24th October 2019, Southwark shared the long-awaited detailed structural report by ARUP engineers, which lays out a design for strengthening and refurbishing the Ledbury Estate tower blocks.

In 2017, it was discovered that the four Large Panel System b...

Please reload

Featured Posts

Ledbury Low Rise Residents Say No To Decisions Behind Closed Doors!

May 31, 2018

1/10
Please reload

Recent Posts

November 28, 2018

November 20, 2018

Please reload

Archive
Please reload

© 2017-2020 by Danielle Gregory. Ledbury Action Group.